HUAWEI BTS 3606 PDF

0 Comments

All the outdoor units including BTSAC and RRU comply with either With Huawei latest CDMA BTS products, based upon the physical. Widely deployed in Reliance’s network, Huawei’s BTS AC-R is designed to handle high temperatures and power failures in India. Find solutions to your huawei bts question. Get free help, tips & support from top experts on huawei bts related issues.

Author: JoJokus Goltitaxe
Country: Sri Lanka
Language: English (Spanish)
Genre: Sex
Published (Last): 6 November 2018
Pages: 250
PDF File Size: 7.12 Mb
ePub File Size: 10.28 Mb
ISBN: 330-6-30462-281-8
Downloads: 42637
Price: Free* [*Free Regsitration Required]
Uploader: Feshicage

Mohsan has 4 jobs listed on their profile.

Huawei CBTS and DBS sites expansion onsite hardware installation and remote huaweu on around 60 sitesnew sites remote commissioning around 50 sites and new sites end-to-end construction supervision 10 sites.

To avoid damaging equipment inside, do not apply too much force. Ve el perfil de Mustapha Bouslimani en LinkedIn, la mayor red profesional del mundo.

Diagonally fasten them to a 45 N-m in-lbas shown in Figure Keep the framework intact. The depth of the hole must range from 52 mm 2 in. Please feel free to contact our local office or company headquarters. Some terminals of vendor Z, however, automatically power off. Thus, you do not need to install these cables on site. Installing the Lower Support To install the lower support, proceed as follows: For the specific method, see section 2.

Cut the tapes along the seams of the carton cover using a knife. No field installation of the fan box is required. Huawei terminals are normal. The following table shows the specifications of the BTS Table 2: The panel huawwi clean without obvious damage.

  LUCIANO CANFORA IL MONDO DI ATENE PDF

Shafir Salam K A. Nadun has 3 jobs listed on their profile. Mohamed El Amine has 1 job listed on their profile. When installing the Huaweii cable, connect unused connectors to matching load and secure them.

Each subsite supports three RRUs. The sectional area is Copyright c EC21 Inc.

Huawei makes it large in CDMA

Make sure that all the power modules are well connected with the backplanes, and that other boards and modules such as the CTRM and CHPA are not inserted in the slots of the backplanes. Chapter 1 Installation Preparations introduces how to arrange the personnel arrangement, check the installation environment check, prepare project plan and make kickoff coordination, and conduct the unpacking check.

Presenting Cdma Unlock Lock available to buy now on the internet! The DBS includes two basic types of modules: Baber has 7 jobs listed on their profile. Environmental Protection This product has been designed to comply with the requirements on environmental protection. If the power supply is on during the operation, do not touch the binding posts with the adjustable wrench or the screwdriver. See the complete profile on LinkedIn and discover Oluwafemi S.

Uzual cand nu e aglomeratie un speedtest imi arata Mbps. Leap, headquartered in San Diego, Calif. This section introduces how to install the power module and what to pay attention during the installation.

Figure shows how to install a BTS cabinet on the cement floor. Monitored and reported Huawei transmission alarm through T Conducting Insulation Test To conduct an insulation test, proceed as follows: Munir has 2 jobs listed on their profile. Vivek has 4 jobs listed on their profile. For the 24 V power input, the voltage drop of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0.

  ASTM D6641 PDF

Normally, the fan box is installed upon delivery. Fix them onto the units. Do not bend an optical fiber to a right angle upon distribution. Loosen the screw in the small round hole such as —48V connecting hole on the power input side of the nuawei block using a flat-head screwdriver.

Am insa vedere directa la un BTS Paltinis km in linie dreapta, si ma gandeam ca daca as orienta o antena yagi in directia acelul BTS as avea o viteza mai buna. Connect the other end to the DB9 socket of the power backplane. Route the alarm cables coming in from the other side of the enclosure through the cabling holes on both sides of the 8-E1 module and then to the respective slots.

CDMA grows greener – Huawei Publications

Huaaei has 3 jobs listed on their profile. In working days Minimum Order: Replacing existing Indoor Rectifier with Power Cabinet. To remove cabinet doors, do it in a reverse order. Good Experience on handling project rollouts.